안전관리계획서 제출대상 Construction work ‘safety management plan’ drafting and submitting entity, submission period, establishment target

안전관리계획서 제출대상Submission: Construction Safety Management Comprehensive Information Network (www.csi.go.kr)
Subject of preparation of the plan: Construction business operator and registered housing construction company Submission body: Procuring office and head of authorization/permission agency Submission period: Within 7 days from the date of notification to the construction business operator, etc.    *  「Construction Technology Promotion Act Enforcement Decree」 Article 98 (Establishment of Safety Management Plan)         ⑦ A copy of the safety management plan and the results of the review pursuant to Article 62 (3) of the Act shall be submitted to the Minister of Land, Infrastructure and Transport within 7 days from the date of notification to the construction business operator or registered housing construction business operator pursuant to Paragraph 3. ⑨ In accordance with Article 62 (10) of the Act, the ordering office and the head of the authorization/permission agency requested to take necessary measures, such as a corrective order, shall order the construction business operator and registered housing construction business operator to amend or supplement the safety management plan and plan review results, and if the amendment or supplementary measures are completed, they must be submitted to the Minister of Land, Infrastructure and Transport within 7 days do

1. Construction work for Class 1 facilities and Class 2 facilities
*「Special Act on Safety and Maintenance of Facilities」Article 7     * 1. Type 1 facility       A. High-speed rail bridges, road and railway bridges with an extension of 500 meters or more B. High-speed rail and urban rail tunnels, road and rail tunnels with an extension of 1000 meters or more. Lock facility and breakwater with an extension of 1000 meters or more d. Multi-purpose dams, power generation dams, flood-only dams, and water-only dams with a total storage capacity of 10 million tons or more E. Buildings with 21 floors or more or a total floor area of ​​50,000 square meters or more F. Estuary embankment, embankment with a capacity of 80 million tons or more F. Multi-regional water supply, industrial water supply, local water supply with a daily supply capacity of 30,000 tons or more * Class 2 facilities Road and railway bridges with a length of 100 meters or more B. High-speed national highways, general national highways, road tunnels in special cities and metropolitan cities, and railroad tunnels in special cities or metropolitan cities. A breakwater with a length of 500 meters or more d. Dams exclusively for local waterworks and water-only dams with a total storage capacity of 1 million tons or more E. Buildings with 16 floors or more or a total floor area of ​​30,000 square meters or more Seawalls with a water storage capacity of 10 million tons or more F. Local waterworks with a daily supply capacity of less than 30,000 tons

Types of Facilities (Special Act on Safety and Maintenance of Facilities).pdf
0.07MB

2. Construction work excavating more than 10M underground3. Due to the use of explosives *Construction work expected to affect the surroundings * Surroundings: Facility within 20M or breeding livestock within 100M4. Construction work of buildings with 10 or more floors and less than 16 floors 5. Remodeling or dismantling of buildings with 10 or more floors6. Vertical expansion type remodeling according to Article 2, Subparagraph 25 C of the 『Housing Act』7. Construction work in which registered *construction machinery is used in accordance with Article 3 of the 『Construction Machinery Management Act』 *Construction machinery: drilling machine (higher than 10M), pile driver and lifter, tower crane (※ lift car not applicable)8. 『Enforcement Decree of the Health Protection Act』Article 101-2 Paragraph 1 of *Construction work using temporary structures    * Scaffolding     ㆍ Height of 31m or more      ㆍ Bracket Scaffolding      * Forms and shores       ․   ㆍ Formwork with a height of 5 meters or more        Positions with a height of 5 meters or more     * Temporary structures     ㆍ Temporary structures (SWC, RCS, ACS, WORKFLATFORM, etc.)      ㆍ Complex type temporary structures manufactured, assembled, and installed at the construction site (temporary vent, work cart, lining form, joint wall support, etc.)      ㆍ Temporary structures that move using power (FCM, ILM, MSS, etc.) Other construction works other than the above construction works *Construction works for which the owner recognizes that safety management is particularly needed

Establishment of safety management plan (Enforcement Decree of Health Checkup Act).pdf